Projects list
2022202120202019201820172016201520142013201220112010200920082007200620052004200320022001200019991998
Previous years
2022202120202019201820172016201520142013201220112010200920082007200620052004200320022001200019991998
- Opracowanie zasad i wytycznych dotyczących stosowania środków ochrony indywidualnej w małych i średnich przedsiębiorstwach
- Development of principles and guidelines for the use of personal protective equipment in small and medium-sized enterprises
- "Research on the improvement of photochemical properties of ""smart"" optical filters in eye protectors"
- Badania nad poprawą właściwości fotochemicznych "inteligentnych" filtrów optycznych w ochronach oczu
- Investigating the influence of welding shields in the aspect of welders' visual functions disorders
- Badnie wpływu stosowania osłon spawalniczych w aspekcie zaburzeń funkcji widzenia u spawaczy
Summary
Development of principles and guidelines for the use of personal protective equipment in small and medium-sized enterprises
Project leader: Adam Pościk M.Sc. (Eng.)
Project summary:
On the basis of the results of studies, criteria for the assessment of compliance of the use of personal protective equipment with the requirements of the 89/656/EEC directive were developed. Also developed were information materials (checklists, brochures and training materials) and an Internet service. The developed criteria and tools supporting the selection and use of those measures (checklists for selected workstations, guides with the principles of the selection and use of personal protective equipment for selected sectors, and training materials in the form of multimedia presentations) were verified. Part of the task consisted in developing a forecast on the adaptation of the working conditions in Polish enterprises to EU requirements, on the basis of the Łódź region. This forecast was used in developing - as part of the LORIS programme - a strategy for the development of the Łódź region.
Project organization: Laboratory of Eye and Face Protection
Project period: 01.12.2003 – 30.11.2004