Wykaz Projektów
- Opracowanie metod i narzędzi do badania warunków pracy z wykorzystaniem subiektywnych ocen narażenia zawodowego
- Pogłębione analizy wypadków przy pracy w ramach Centrum Analiz Wypadkowych.
- Evaluation of the companies functioning in the area of health and safety with the use of performance and leading indicators.
- Assessment of the impact of environmental factors on sickness absenteeism at work.
- Development of methods and tools to examine working conditions using subjective assessments of occupational exposure.
- Deepening the analysis of accidents at work within the Centre for Accident.
- Costs and benefits of actions aimed at limiting work-related sickness absenteeism.
- Ocena funkcjonowania przedsiębiorstwa w obszarze BHP z wykorzystaniem wskaźników wynikowych i wiodących
Streszczenie
Deepening the analysis of accidents at work within the Centre for Accident.
Kierownik projektu: Szymon Ordysiński M.Sc.
Streszczenie projektu:
Based on the statistical analysis of data on accidents at work, registered by GUS, types of work with the highest accidents risk at work were selected. Number of accidents at work and their frequency in particular types of economic activities were examined. Multivariate data analysis was conducted using segmentation method (two-stage grouping), which made possible to classify accidents at work taking into consideration many variables describing at the same time the environment and the victim. The analysis effectively helped to identify those types of work, which may cause risk at work. In these types of work in-depth basket analysis was carried out to find the course and causes of accidents at work. This analysis allowed to identify most common course of accidents. analysis was carried out aimed at system improvement enabling data registration concerning accidents at work and study tools, by proposals of statistical accident card modification. Data from analysis and training materials containing information on results were prepared.
Jednostka: Pracownia Zarządzania i Oceny Ryzyka
Okres realizacji: 01.01.2011 – 31.12.2013